Ventorie/Help
DocsGetting StartedYour First Replenishment Plan
Getting Started

Your First Replenishment Plan

From connected data to a draft purchase order: set lead times, review Action Items, and create POs in one click.

What you'll need

At least one sales channel connected (for demand), inventory synced (3PL or an imported snapshot), and vendors assigned to your products.

1. Set lead times

Open Planning → Lead Times. There are three tabs: • Manufacturing — how long each vendor takes to produce. • Inbound Shipping — transit time per route (vendor → destination). • Warehouse Transfers — time between your own locations. Once you have PO history, Ventorie shows what lead times have actually been ("~28d from 6 POs") so you can correct estimates with real data. Accurate lead times are the single most important planning input.

2. Tune the planning settings

On Replenishment → Planning, the settings bar controls the plan: • Buffer days — safety stock, in days of demand beyond lead time. • Reorder freq — how often you place vendor orders; suggested quantities cover this window. • Expiry buffer, Gap warning buffer, Redistribution buffer, FBA max coverage — finer controls with hover explanations. Defaults are sensible; you can refine later.

3. Read the Action Items

Replenishment → Action Items is your to-do list. Each card is a recommendation with an urgency label that says when to act: • Order now — the reorder window is already open or overdue. • Order this week — it opens within 7 days. • Order soon — 7–14 days out. • Scheduled — more than 14 days out. Redistribute cards ("Redistribute now", etc.) mean a location needs stock moved to it rather than bought. Usually another of your warehouses has surplus, and the card names the donor location and the quantity to send — move stock instead of buying more. Sometimes no location can spare it yet: the card still shows, because the shortfall is real, but it points you at a vendor order into the network (or expediting an inbound) and a transfer once that lands.

4. Create draft POs

On the Planning tab, a banner counts products needing reorder within the next N days (click the number to change the window). Click Create Draft POs, review the checkbox list and suggested quantities (bumped to each product's MOQ), and confirm — Ventorie creates one draft PO per vendor. Review and submit them on the Purchase Orders page.